Posts

Showing posts from September, 2022

October 2022

Image
  1 Oct 2022 10 HoS (10 Total HoS). (124): Artecy: Great Smoky Mountains: .75 HoS. (.75)   (70) TPS: Evergreen Sampler: 3.25 HoS. (3.25) (13): Air Force: 3 HoS. (3) (47): October Kringle: 2 HoF = FFO (105): Blooming Tiny Town: 1 HoS. (1) 2 Oct 2022 5.25 HoS (15.25 Total HoS). (13): Air Force: 1 HoS. (4) (125): Bathing: 3 HoS. (3) (70) TPS: Evergreen Sampler: 1.25 HoS.(Fox) (4.5)    3 Oct 2022 9.5 HoS (24.75 Total HoS). (96): Owl Forest: 1 HoS.  (1) (70) TPS: Evergreen Sampler: 1.5 HoS.(Fox) (6) M**Bee Tree Blanket: 4 HoK.  (4) N***Go Tell the Bees: 3 HoK. (3) 4 Oct 2022 7.75 HoS (32.5 Total HoS). N***Go Tell the Bees: 1.5 HoK. (4.5) (70) TPS: Evergreen Sampler: 1 HoS.(Fox) (7) (124): Artecy: Great Smoky Mountains: .30 HoS. (1.25)   (70) TPS: Evergreen Sampler: 1 HoS.(Fox) (7) (96): Owl Forest: 1.25 HoS.  (2.25) M**Bee Tree Blanket: 1 HoK.  (5) (125): Bathing: 1.5 HoS. (4.5) 5 Oct 2022 6.5 HoS (39 Total HoS). N***Go Tell the Bees: 1.5 HoK. (6) M**Bee Tree Blanket: 3 HoK.  (8) (70) TPS:

Twin Peak’s Winter

Image
This project, started on 30 Aug 2022, is being stitched on 25 count Vintage Country Mocha using the called for DMC flosses.  Called for DMC 971: 970. After 5 hours of stitching:

Playing with Jax

Image
This project is being stitched on 32 count Wheat Lugana using the called for DMC flosses.  After 11.25 hours of stitching: After 18 hours of stitching: I’ve decided to make this into an ornament with just three pumpkins.  Then I will do the whole design without the Jack-O-lantern face to be completed for Fall 2023.

Lone Skein Shawl: MTF

Image
This pattern is by Joji. I’m participating in her KAL for Sep 2022. My yarn is Oasis Fingering (50% Camel; 50% Silk) in the colorway “Mesmerized” (500 yds). I’m knitting with #6 32” Knitter’s Pride Nova Cubics. I would suggest using lace needles next time due to the number of p2togtbl throughout the design. Using the Cubics, I am doing an alternate p2togtbl: (p1, move peeled stitch back to the left needle, pass the next stitch over the purled stitch, move this stitch to the right needle) After 34.25 hours of knitting: 28 Sep 2022: After 46 hours of knitting, the shawl is done and on its way to finishing…2 days sooner than the 30 Sep deadline…and there is enough yarn leftover to make the tassels.  (This picture is before blocking).